Demolition work has begun again in the basement, first with the bathroom then we'll move on to the bedroom down there.
M is planning to redo pipes and electrical so he wants to clear space for that, but it speeds up the need for me to decide what I want to do with the space.
This bathroom will change shape most likely and the shower will certainly be redone. Oh and yes, that window will be repaired, that was a quick fix to cracked glass when it was negative temperatures.
Can't say I'm sure about what I want for this bathroom, but maybe something like this. Or maybe this. Gosh, I don't know.
But that carpet has got.to.go. As soon as possible.
Last week, we had a dumpster delivered to clean out the shop and for the basement demolition too.
We're still deciding what to do in the house and M has been working on plans for radiant heat, so he's been working on future layouts, and conversations like, Should we move the basement stairs?
One day, guys, this house is going to be amazing. Until then, we'll be over here knocking down walls.